Mumbai gets Two New Railway Lines Mumbai gets Two New Railway Lines News Mumbai gets new two additional railway lines connecting Thane and Diva. It will be a great addition in Western Railways. Shivangi <html> <p><span style="font-weight: 400;">Our Honourable Prime Minister Narendra Modi on Friday inaugurated newly constructed 9.44-km-long 5th and 6th railway lines connecting Thane and Diva through video conferencing. He also flagged off additional suburban train services.</span><a href="https://twitter.com/PIB_India/status/1494639005685940224?ref_src=twsrc%5Etfw%7Ctwcamp%5Etweetembed%7Ctwterm%5E1494639005685940224%7Ctwgr%5E%7Ctwcon%5Es1_&amp;ref_url=https%3A%2F%2Fd-21469771654265141628.ampproject.net%2F2202042210001%2Fframe.html"><strong> In a tweet, PIB India said:</strong></a><span style="font-weight: 400;"> &ldquo;The two additional railway lines connecting Thane and Diva have been built at the approx cost of Rs 620 crores and feature a 1.4 km long rail flyover, 3 major bridges, 21 minor bridges. These lines will also enable the introduction of 36 new suburban trains in the city."</span></p> <div class="admob-ads"> <script async src="//pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script> <!-- Responsive Blog --> <ins class="adsbygoogle" style="display:block" data-ad-client="ca-pub-7159304429864193" data-ad-slot="5773289261" data-ad-format="auto"></ins> <script> (adsbygoogle = window.adsbygoogle || []).push({}); </script> </div> <p><strong>Here are the facts you need to know about Thane and Diva Line:</strong></p> <ol> <li><span style="font-weight: 400;">Kalyan is one of the major junctions of the Central Railway.</span></li> <li><span style="font-weight: 400;"> Outstation trains coming from north and south of the country merge at Kalyan and move towards Chhatrapati Shivaji Maharaj Terminus (CSMT).</span></li> <li><span style="font-weight: 400;"> Kalyan railway station had four tracks of which two were used for slow Mumbai local trains while the other two were for fast local, Mail Express and goods trains.</span></li> <li><span style="font-weight: 400;"> Railways had planned two additional tracks between Kalyan and CSMT to segregate suburban and long-distance trains.</span></li> <li><span style="font-weight: 400;"> Although, the work on the 5th and the 6th lines on the stretches between Kurla and Thane, and Diva and Kalyan, was completed earlier, the two tracks &mdash; each of 9.44 km between Diva and Thane &mdash; were left.</span></li> </ol> <div class="admob-ads"> <script async src="//pagead2.googlesyndication.com/pagead/js/adsbygoogle.js"></script> <!-- Responsive Blog --> <ins class="adsbygoogle" style="display:block" data-ad-client="ca-pub-7159304429864193" data-ad-slot="5773289261" data-ad-format="auto"></ins> <script> (adsbygoogle = window.adsbygoogle || []).push({}); </script> </div> <ol start="6"> <li><span style="font-weight: 400;"> The fifth and sixth line between Thane and Diva is a part of the Mumbai Urban Transport Project (MUTP 2B) and was approved in 2008.</span></li> <li><span style="font-weight: 400;"> These two new lines have been built at an estimated cost of Rs 620 crore and includes a 1.4-km-long flyover, three major and 21 minor bridges.</span></li> <li><span style="font-weight: 400;"> Now with the commissioning of the two new lines, &ldquo;the portion from Kurla-Lokmanya Tilak Terminus (LTT) to Kalyan (36-km) has six lines with a separate corridor for suburban (two slow locals, two fast locals), and long-distance trains (two lines), especially for trains originating/ terminating from/to LTT," Central Railway CPRO Shivaji Sutar told Times of India.</span></li> <li><span style="font-weight: 400;"> Railways said that new lines will enable the introduction of 36 new suburban trains in the city.</span></li> <li><span style="font-weight: 400;"> On Friday, PM Modi said that after commissioning of the 5th and 6th lines, there will be no delays in the passage of mail and express trains going in and out of Mumbai and the additional tracks will also facilitate smooth running of suburban services.</span></li> </ol> <p><br /><span style="font-weight: 400;">To</span> <a href="https://play.google.com/store/apps/details?id=in.trainman.trainmanandroidapp&amp;hl"><strong>book tickets</strong></a><span style="font-weight: 400;"> on this route or any other route,&nbsp; go download the Trainman&rsquo;s application available on </span><a href="https://play.google.com/store/apps/details?id=in.trainman.trainmanandroidapp&amp;hl"><strong>Google Play Store</strong></a><span style="font-weight: 400;"> and </span><a href="https://apps.apple.com/in/app/trainman-irctc-ticket-booking/id962054633"><strong>iOS App Store</strong></a><span style="font-weight: 400;"> with more useful features like</span> <a href="https://www.trainman.in/pnr"><strong>checking the PNR Status</strong></a><span style="font-weight: 400;"> of the booked ticket, </span><a href="https://play.google.com/store/apps/details?id=in.trainman.trainmanandroidapp&amp;hl=en_IN"><strong>Seat Availability</strong></a><strong>,</strong><a href="https://www.trainman.in/running-status"><strong> Running Status</strong></a><span style="font-weight: 400;"> and many more. Also, stay tuned to the </span><a href="https://blog.trainman.in/"><strong>Trainman Blog</strong></a><span style="font-weight: 400;"> to know all the latest updates on Indian Railways.</span></p> </html>

Mumbai gets Two New Railway Lines

Our Honourable Prime Minister Narendra Modi on Friday inaugurated newly constructed 9.44-km-long 5th and 6th railway lines connecting Thane and Diva through video conferencing. He also flagged off additional suburban train services. In a tweet, PIB India said: “The two additional railway lines connecting Thane and Diva have been built at the approx cost of Rs 620 crores and feature a 1.4 km long rail flyover, 3 major bridges, 21 minor bridges. These lines will also enable the introduction of 36 new suburban trains in the city."

Here are the facts you need to know about Thane and Diva Line:

  1. Kalyan is one of the major junctions of the Central Railway.
  2. Outstation trains coming from north and south of the country merge at Kalyan and move towards Chhatrapati Shivaji Maharaj Terminus (CSMT).
  3. Kalyan railway station had four tracks of which two were used for slow Mumbai local trains while the other two were for fast local, Mail Express and goods trains.
  4. Railways had planned two additional tracks between Kalyan and CSMT to segregate suburban and long-distance trains.
  5. Although, the work on the 5th and the 6th lines on the stretches between Kurla and Thane, and Diva and Kalyan, was completed earlier, the two tracks — each of 9.44 km between Diva and Thane — were left.
  1. The fifth and sixth line between Thane and Diva is a part of the Mumbai Urban Transport Project (MUTP 2B) and was approved in 2008.
  2. These two new lines have been built at an estimated cost of Rs 620 crore and includes a 1.4-km-long flyover, three major and 21 minor bridges.
  3. Now with the commissioning of the two new lines, “the portion from Kurla-Lokmanya Tilak Terminus (LTT) to Kalyan (36-km) has six lines with a separate corridor for suburban (two slow locals, two fast locals), and long-distance trains (two lines), especially for trains originating/ terminating from/to LTT," Central Railway CPRO Shivaji Sutar told Times of India.
  4. Railways said that new lines will enable the introduction of 36 new suburban trains in the city.
  5. On Friday, PM Modi said that after commissioning of the 5th and 6th lines, there will be no delays in the passage of mail and express trains going in and out of Mumbai and the additional tracks will also facilitate smooth running of suburban services.


To book tickets on this route or any other route,  go download the Trainman’s application available on Google Play Store and iOS App Store with more useful features like checking the PNR Status of the booked ticket, Seat Availability, Running Status and many more. Also, stay tuned to the Trainman Blog to know all the latest updates on Indian Railways.






Trainman Trainman